Saturday 26 May 2012

What's happening now?


Looking north-east.
The beams supported the old sanctuary floor
Demolition is complete...

The building site is much quieter than it was a few weeks ago -  no more trucks backing in and out of the site, taking away dumpster after dumpster of the remains of the old church building.

Inside, the balcony has been removed, as has the sanctuary floor. The demolition, both inside and out, is complete.

For the moment, it's one very large, very open, space.


Many thanks to our neighbours for your patience during this phase!





Looking north north-west.



...but the work continues inside!

In spite of the relative quiet outside, work continues inside the building.

Foundation work and underpinning are well underway, and should be complete by the end of May.

A new floor slab has been poured in the northwest corner of the basement, where our new elevator will be located.

Steel work will start soon, as will the under floor plumbing and electrical work.





Old sanctuary exit
(doors into narthex)
Foundation work and
underpinning 
New floor slab and
future site of the elevator

Thursday 3 May 2012

Trees, Solar Energy & Chimney Swifts

One of the benefits of this project is the fresh perspective we're getting on the role the natural world plays on our construction site and in our neighbourhood.

At Beach United Church, we believe we are called to care for the earth and its resources, creation and all living creatures. Our construction project is an opportunity to put that belief into action.

Planting New Trees

We've been working with the recommendations of an arborist and the City of Toronto to protect all the trees on the site during construction. Especially during construction, the trees are being protected by separating them with an 8-foot plywood hoarding and a bed of woodchips. One tree, a black locust on the southeast corner of our property, is being taken down with the City's permission, as it was impossible to protect it during the demolition work. We will plant three replacement trees in Spring 2013.

Generating Alternative Energy

One of our goals with the renovation is to reduce our environmental footprint. For a start, we're reducing our physical footprint (by demolishing the south wing of the building). In addition, we've been planning a solar installation on the south side of our pitched roof. Based on information from the Ministry of the Environment, Greenpeace and the International Panel on Climate Change, a solar pv installation the size of Beach United's proposal can:
  • reduce carbon dioxide emissions by approximately 35 tonnes each year going forward
  • provide equivalent environmental benefits of planting over 170 trees annually in this area
  • reduce equivalent emissions of over 50,000 km driven on our roads each yea

Protecting Chimney Swifts

One of our Beach neighbours alerted us that a family of chimney swifts - a threatened species in Ontario - appeared to have been nesting in an unused chimney on our north building last summer. Our original plans called for demolishing this chimney, as it casts a shadow which would reduce our rooftop solar collection by 20%. No one ever said environmental stewardship was easy!

We've been consulting with the Ministry of Natural Resources and Bird Studies Canada on how to proceed.

Chimney swifts are an interesting species. This insect-eating bird once nested primarily in hollow trees, and then adapted to human settlement by nesting in chimneys. Now chimneys are less common, use of pesticides have eliminated insects which are an important food source, and the chimney swift population is declining. Surprisingly, even though humans and swifts have been sharing the same address for a few centuries, there's still a lot to be learned about our feathered neighbours.

View of Beach United Church from the south side
of Queen Street East on April 24, 2012.