Monday, 25 June 2012

The chimney swifts are back

In May, we reported that a family of chimney swifts might required us to reconsider our plans to demolish an unused chimney on our north building.

Well, the swifts have returned to their nest in our chimney. That's good news, because chimney swifts are a threatened species in Ontario.

More good news: we’ve been able to reconfigure the arrangement of solar roof panels we’re planning to mitigate the effects of the chimney’s shadow on solar collection. So the chimney can stay, the chimney swifts can enjoy their nest, and we can still plan to reduce Beach United’s energy footprint. Yay!
You can learn more about chimney swifts in this article by Tim Tiner from ON Nature Magazine.

Condo rumours are greatly exaggerated

Now that we’ve demolished the south portion of our church building, some people are wondering what we’re planning to do with that piece of land.

The answer is, we don’t know yet. Lots of ideas have been discussed by our congregation, but no decisions have been made. Right now, renovating our church is our main priority.

One of our neighbours let us know that they've heard our south lot has been sold to a private group and that it may house a future condo development. That story is not true.

If you have questions about our church project, or hear a story you’d like to confirm, please feel free to ask us about it. You can post a comment on this blog, or reach Beach United’s HOMe project team directly at home@beachuc.ca.


Thursday, 14 June 2012

A new look at street level

There is a lot of progress on our renovation, but much of the work is hard to see from the street. So here’s the latest....

Most of the work needed on the foundation is complete. And most of the existing structural steel has been reworked and installed for the new wood floor in the sanctuary.

By the way, the sanctuary floor on the second level used to be sloped, but the new floor will be level. That will make it easier to use the space for different functions, as well as making it easier to walk on.

The renovated church will also have an elevator to help move people, food and other supplies from one floor to the next. Masonry work for that is starting soon.

The most obvious change is the building's new look at street level.

The ground outside the church along Wineva is being regraded, and that’s probably what you’ll notice most the next time you walk by the site. Lowering the grading means we will be able to enter the building at street level, and the rooms on the ground floor will have more sunlight.

You can see the difference in the before-and-after photos:

Before: built-up landscaping meant the front entrance
was on the church's 2nd floor. You had to climb stairs to reach it,
and the lower floor didn't have any windows at the front.

After: removing the landscaping and lowering the grade makes
the church will be more accessible from street level. Windows
will be added to the lower floor, where the church offices will
be located.



Saturday, 26 May 2012

What's happening now?


Looking north-east.
The beams supported the old sanctuary floor
Demolition is complete...

The building site is much quieter than it was a few weeks ago -  no more trucks backing in and out of the site, taking away dumpster after dumpster of the remains of the old church building.

Inside, the balcony has been removed, as has the sanctuary floor. The demolition, both inside and out, is complete.

For the moment, it's one very large, very open, space.


Many thanks to our neighbours for your patience during this phase!





Looking north north-west.



...but the work continues inside!

In spite of the relative quiet outside, work continues inside the building.

Foundation work and underpinning are well underway, and should be complete by the end of May.

A new floor slab has been poured in the northwest corner of the basement, where our new elevator will be located.

Steel work will start soon, as will the under floor plumbing and electrical work.





Old sanctuary exit
(doors into narthex)
Foundation work and
underpinning 
New floor slab and
future site of the elevator

Thursday, 3 May 2012

Trees, Solar Energy & Chimney Swifts

One of the benefits of this project is the fresh perspective we're getting on the role the natural world plays on our construction site and in our neighbourhood.

At Beach United Church, we believe we are called to care for the earth and its resources, creation and all living creatures. Our construction project is an opportunity to put that belief into action.

Planting New Trees

We've been working with the recommendations of an arborist and the City of Toronto to protect all the trees on the site during construction. Especially during construction, the trees are being protected by separating them with an 8-foot plywood hoarding and a bed of woodchips. One tree, a black locust on the southeast corner of our property, is being taken down with the City's permission, as it was impossible to protect it during the demolition work. We will plant three replacement trees in Spring 2013.

Generating Alternative Energy

One of our goals with the renovation is to reduce our environmental footprint. For a start, we're reducing our physical footprint (by demolishing the south wing of the building). In addition, we've been planning a solar installation on the south side of our pitched roof. Based on information from the Ministry of the Environment, Greenpeace and the International Panel on Climate Change, a solar pv installation the size of Beach United's proposal can:
  • reduce carbon dioxide emissions by approximately 35 tonnes each year going forward
  • provide equivalent environmental benefits of planting over 170 trees annually in this area
  • reduce equivalent emissions of over 50,000 km driven on our roads each yea

Protecting Chimney Swifts

One of our Beach neighbours alerted us that a family of chimney swifts - a threatened species in Ontario - appeared to have been nesting in an unused chimney on our north building last summer. Our original plans called for demolishing this chimney, as it casts a shadow which would reduce our rooftop solar collection by 20%. No one ever said environmental stewardship was easy!

We've been consulting with the Ministry of Natural Resources and Bird Studies Canada on how to proceed.

Chimney swifts are an interesting species. This insect-eating bird once nested primarily in hollow trees, and then adapted to human settlement by nesting in chimneys. Now chimneys are less common, use of pesticides have eliminated insects which are an important food source, and the chimney swift population is declining. Surprisingly, even though humans and swifts have been sharing the same address for a few centuries, there's still a lot to be learned about our feathered neighbours.

View of Beach United Church from the south side
of Queen Street East on April 24, 2012.



Monday, 9 April 2012

Work has begun!

Beach United's north building will be redesigned.
It's now apparent to anyone passing by our church building that something big is happening! After months of planning, construction work is now underway.

With the connecting structure removed, you can see that we actually have two church buildings on this site. The north building, which houses our sanctuary, will be retained and dramatically redesigned to incorporate a kitchen, meeting space and offices. The south building will be demolished completely.


All the stained glass and other valuable property that we want to keep for our redesigned building has been carefully removed and put into storage.